Power and utilities
Protecting generation capacity, and the grid that depends on it.
WATERWEB has protected hydroelectric and thermal generating stations in Karnataka for decades. Its work includes CO2 flooding systems for ten generators at Karnataka Power Corporation (KPCL) hydroelectric stations.

What is at stake
In power generation, the cost of a fire is measured not only in damaged equipment but in lost capacity. Generator stators, large transformers and turbine components can take many months to replace, and a fire in a cable gallery or control room can take an entire unit offline. Underground and remote stations add further challenges of access and smoke control.
Effective protection therefore treats each area of the station according to its hazard: nitrogen injection and water spray for transformers, CO2 flooding for generators and linear heat detection in cable galleries. These are then integrated into a single fire protection scheme that is straightforward to maintain.
24 weeks
was the average downtime after large turbine-building fires in FM Global's loss history. Where recommended protection was in place, it fell to under two weeks.
Protected areas
The principal hazard in each area of the facility, and the protection WATERWEB applies to it.
| Area | Principal hazard | Protection |
|---|---|---|
| Transformer yard | Tank rupture and oil pool fire following an internal fault | Nitrogen injection, high-velocity water spray, fire barriers |
| Generators | Winding insulation fire within an enclosed machine | CO2 total flooding with automatic detection |
| Cable galleries and spreader rooms | Rapid fire spread along stacked cable trays | Linear heat detection, medium-velocity water spray |
| Turbine lubricating oil | Pressurised oil spray and pool fires | Water spray and deluge, flame detection |
| Control rooms and switchgear | Electrical fire in critical control equipment | Addressable detection, gaseous suppression |
| Coal and fuel handling | Conveyor belt fires, self-heating coal and fuel oil | Conveyor deluge, foam, hydrant systems |
Relevant systems
CO2 and clean-agent suppression
Total-flooding protection for generators, control rooms and server rooms.
Transformer protection
Nitrogen injection systems that prevent explosion and fire in oil-filled transformers.
Water spray systems
High- and medium-velocity water spray for transformers, fuel handling and other high-hazard plant.
Fire detection and alarm
Conventional and addressable fire alarm systems, and linear heat detection.
Fire hydrant systems
Internal wet risers, external hydrant networks, hose reels and fire pump installations.
Regulatory context
The Central Electricity Authority requires an automatic fire protection system for every transformer of 10 MVA and above, and its technical standards for construction set fire protection requirements for thermal stations, hydro stations and substations. WATERWEB designs to these requirements, to the relevant Indian Standards including IS 3034, and to NFPA 850 and 851 where specified.
Project record
Facilities in this sector for which WATERWEB has designed, installed or maintained fire protection systems.
- KPCL, Sharavathi Generating StationSharavathi
- KPCL, Gerusoppa Generating StationGerusoppa
- KPCL, Mahatma Gandhi Hydro-Electric StationJog Falls
- KPCL, Mani Dam Power HouseMani
- KPCL, Ghataprabha Dam Power HouseBelagavi district
- KPCL generating stationAmbikanagar
- KPCL generating stationShivanasamudra
- KPCL, Raichur Thermal Power StationRaichur
- Hindustan PowerplusHosur
- Jindal PraxairToranagallu, Ballari
Discuss your facility with our engineering team
Send us the details of your site and WATERWEB will arrange a survey and a proposal.
