CO2 protection for ten generators across Karnataka's hydroelectric stations

Karnataka Power Corporation (KPCL) needed to protect its hydroelectric generators against winding fires without exposing the machines to water damage. WATERWEB designed, supplied, installed and commissioned CO2 total-flooding systems for ten generators.

Generator hall of a hydroelectric power station

Challenge

A fire within a generator's windings can destroy the machine and remove generating capacity from the grid for months. Water cannot be applied to energised windings, and the stations lie in remote areas, far from public fire services, so protection must act automatically and at once.

Several of the stations have been in service for decades, and their generators sit in enclosed housings inside powerhouses built into river valleys. The protection had to fit within the existing machine housings without structural change, withstand the high humidity of the monsoon months, and be simple enough for station staff to inspect and reset between service visits. Each installation also had to be completed during scheduled machine outages, so that no generating capacity was lost to the work itself.

Solution

WATERWEB designed CO2 total-flooding systems that detect fire within the generator enclosure and discharge carbon dioxide to extinguish it, leaving no residue on the machine. CO2 flooding remains the established method for enclosed hydro generators internationally: the US Bureau of Reclamation, for example, relies on CO2 alone for automatic generator fire suppression across its hydroelectric fleet.

  • Automatic detection inside each generator enclosure
  • Main and reserve CO2 cylinder banks, with an initial discharge to extinguish the fire and an extended discharge to hold the concentration while the machine runs down
  • Manual release at the machine, with interlocks to the generator protection scheme
  • Complete scope: design, supply, installation, testing and commissioning

Results

  • Ten generators protected across six generating stations in two districts
  • Every installation tested and commissioned before the machine returned to service, with a full handover dossier
  • Station staff trained to inspect, isolate and reset each system

WATERWEB has also protected KPCL facilities at Ambikanagar, Shivanasamudra and the Raichur Thermal Power Station.

Protecting generators, turbines or transformers?